The addition is beginning to look more and more like a building. The roof deck over the gymnasium is now about 60% done. After the deck goes down, then insulation is put on top of that and then finished with a metal roof, colored to match our existing shingles. The classroom side now has most of the wood trusses up on that and the roof sheathing is underway. More metal stud walls go up every day and as they go up, the electrical and plumbing parts that go behind the wall surface are being installed. Brick is now stored on site and that will start to go up in the next week or so. We're now hoping to have the building 'dried-in' by the end of the month.