Thursday, March 25, 2010

Update 03.25.10











Lots happening this week. The roofers are working on putting the insulation on the main gymnasium roof in preparation for putting the final metal roofing layer on soon. The roof above the classroom also received some material that helps keep water out before they put the metal roof on that side too. The window contractors are here today putting in the glass that goes in the window frames that was installed last week. The site contractor is making use of dryer weather and is working on the finish grading of the big pond - pushing the top soil back over the entire area. Electricians are running conduit and installing connection boxes in the gym ceiling for the lighting that will be installed there. The exterior metal stud walls around the gym area are going up too and plywood sheathing covers the studs.