The rain on Monday set us back again but with the sun shining today, several work crews were on site. The masons began building the cinderblock walls between the classrooms and around the gymnasium. As the masons moved upwards, the electricians installed conduit in the walls for wiring. The metal stud wall crew continued work on the exterior walls and framing the doors and windows. Work was continued on building the mezzanine storage area floors with metal decking covering the floor joists.