Over the past couple of days, the building has had some dramatic progress. The steel roof joists over the gymnasium have been installed. The plywood sheathing around the outside of the classroom section is being installed. The wood floor joists that frame the mechanical mezzanine above the classroom section have been installed and the plywood floor will be installed in the next day or two. Once this mezzanine floor is built, the wood roof trusses over the classroom area will be installed. Concrete block walls are going up around the gymnasium. The new boiler and pumps for the heating and cooling system have been placed in the existing mechanical room. The stage area has been prepped to receive the concrete floor that goes there and the adjacent rooms. When we have dry days, a lot gets done. But rain is forecast for tomorrow...