Work continues on the building pad with tons of dirt being brought from the drainage pond area to level out the back yard where the new building will be put. Concrete drainage pipes are being installed at various places in the back area where storm water will be captured and drained away from the property. The bridge over the ditch out front is about complete and we're expected to get the new fire road roughed in during the new few days. The lawn shed is being moved tomorrow to get it out of the way of the new road. The new drainage pond area (where all of the trees were cleared) is rapidly taking shape.