Update 07.20.10
















Back in town now and catching up on posts about the building progress. More steady progress to report on. The lobby expansion is well underway now with the concrete floor slab in place, steel up and wood framing in progress. Trusses are due to arrive any day now. In the rest of the building, the ceiling grid is mostly up with lights being installed. In the gym, light fixtures are up and the basketball goals have been installed. Cabinets have been installed throughout the building. Outside, the concrete ditch work is finished and the new electrical transformer is due to be installed soon.